PASPORTISATION
One of the main qualities of CAFM system is providing the information about space and objects where supportive facility processes of the company running. Building survey and its quality means an important service, result of which determines a quality of FM processes management in considerable way.
During its existence ASP realised few large projects of pasport (all buildings of CVUT, Plzensky brewery, all buildings of Slovenskeho plynarenskeho prumyslu -Slovak gas industry, Stredoslovenskej energetiky-Midslovak energy company,...) Methodics and technology of buildings survey continued developing and it has following forms these days:
During its existence ASP realised few large projects of pasport (all buildings of CVUT, Plzensky brewery, all buildings of Slovenskeho plynarenskeho prumyslu -Slovak gas industry, Stredoslovenskej energetiky-Midslovak energy company,...) Methodics and technology of buildings survey continued developing and it has following forms these days:
DIGITALISATION OF CONSTRUCTION DRAWINGS
Architecture/Space and Technology
CONSTRUCTION VARIANT 1
Variant 1 includes basic processing of paper and AutoCAD drawings.
Paper drawing
Paper drawing will be digitalised and the layer of Rooms numbers will be created. The layer of Rooms numbers will be connected with the system.
Autocad drawing
AutoCAD drawing will be connected with the system without any other amendments of order, colour and nomenclature levels. The layer of Rooms numbers will be processed. The layer of Rooms numbers will be connected with the system.
AutoCAD drawing will be connected with the system without any other amendments of order, colour and nomenclature levels. The layer of Rooms numbers will be processed. The layer of Rooms numbers will be connected with the system.
Includes:
taking over of paper drawings and scanned drawings | |
transfer of scanned drawings to OBR format | |
digitalisation of rooms numbers in the drawing | |
creation of graphical objects from rooms numbers in the drawing | |
interconnection of OBR format with the system | |
creation of rooms code list (found out from drawing documentation) in range: code, number, area, purpose | |
import of pictures and rooms code list into system |
Includes:
takeover of AutoCAD drawings | |
transfer of AutoCAD drawings into OBR format | |
digitalisation of rooms numbers in the drawing | |
creation of graphical objects from rooms numbers in the drawing | |
interconnection of AutoCAD drawings with the system | |
creation of rooms code list (identified from drawing documentation) in the range: code, number, area, purpose | |
import of pictures and rooms code list into system |
EXTENDED VARIANT CONSTRUCTION 1 - AREAS
Extended variant 1 includes processing of AREAS paper in AutoCAD drawings.
Paper drawings
Paper drawing will be digitalised and the layer Rooms numbers and Rooms Areas (polygons) will be created. Layer Rooms Areas will be connected with system.
AutoCAD drawing
AutoCAD drawing will be interconnected with the system without any other amendments of order, colour and nomenclature levels .The layer of Rooms Numbers and Rooms Areas will be processed. The layer Rooms Areas will be interconnected with the system.
AutoCAD drawing will be interconnected with the system without any other amendments of order, colour and nomenclature levels .The layer of Rooms Numbers and Rooms Areas will be processed. The layer Rooms Areas will be interconnected with the system.
VARIANT CONSTRUCTION 2
Variant 2 includes fully processed paper and AutoCAD drawings without the alignment.
Paper drawing
Paper drawing will be fully digitalised into layers: Rooms Numbers, Rooms Areas, Masonry, Windows, Doors, Facilities. The layer Rooms Areas will be interconnected with the system.
AutoCAD drawing
AutoCAD drawing will be interconnected with the system with the amendments of order, colour and nomenclature levels. The layer of Rooms Numbers and Rooms Areas will be processed. The layer Rooms Areas will be interconnected with the system.
AutoCAD drawing will be interconnected with the system with the amendments of order, colour and nomenclature levels. The layer of Rooms Numbers and Rooms Areas will be processed. The layer Rooms Areas will be interconnected with the system.
VARIANT CONSTRUCTION 3
Variant 3 includes fully processed paper or AutoCAD drawings with the alignment.
The drawing will be aligned and digitised into layers: : Rooms Numbers, Rooms Areas, Masonry, Windows, Doors, Facilities, Quotes. The layer Rooms Areas will be interconnected with the system.
The drawing will be aligned and digitised into layers: : Rooms Numbers, Rooms Areas, Masonry, Windows, Doors, Facilities, Quotes. The layer Rooms Areas will be interconnected with the system.
OTHER ADDITIONAL WORKS ON CONSTRUCTION DRAWINGS
- over-numbering of the areas in the given drawing documentation
- control (examination) of areas
DIGITALISATION TZB DRAWINGS
VARIANT TZB1
Variant TZB1 includes basic processing of paper and AutoCAD drawings TZB.
Paper drawing
Paper drawing TZB will be digitized and fit together with construction drawings without other amendments (modification).
AutoCAD drawing
AutoCAD drawing TZB will be connected with construction drawings without any other amendments of order, colour and nomenclature levels.
AutoCAD drawing TZB will be connected with construction drawings without any other amendments of order, colour and nomenclature levels.
Includes:
taking over paper drawings TZB and drawings scanning | |
transfer of scanned drawings TZB in the format OBR | |
montage of TZB drawing with construction drawing | |
interconnection the format OBR with the system | |
import TZB into system |
Includes:
takeover AutoCAD drawings TZB | |
transfer of AutoCAD drawings TZB into the OBR format | |
montage AutoCAD TZB drawings with the construction drawing | |
interconnection AutoCAD drawings TZB with the system | |
import pictures and code list of TZB equipment into the system |
VARIANTA TZB 2
VVariant TZB2 includes basic processing of paper and AutoCAD drawings TZB.
Papaer drawing
Paper drawing TZB will be digitized and fit together with construction drawings. The layers of TZB will be created (according to the type of TZB). The layer Facility TZB will be connected with the system.
AutoCAD drawing
AutoCAD drawing will be put together with the construction drawing and interconnected with the system by making adjustments of order, colour and terminology levels. The layer Facility TZB will be processed. The layer Facility TZB will be connected with the system.
AutoCAD drawing will be put together with the construction drawing and interconnected with the system by making adjustments of order, colour and terminology levels. The layer Facility TZB will be processed. The layer Facility TZB will be connected with the system.
Includes :
taking over paper drawings and drawings scanning | |
transfer of scanned drawings in the format OBR | |
digitizing TZB equipment | |
montage of TZB drawing with construction drawing | |
creating graphic objects of TZB equipment | |
interconnection the format OBR with the system | |
creating code list of TZB equipment (identified from drawing documentation) in the range: code, type of device (catalogue) | |
import pictures and code list of TZB equipment into the system |
Includes :
takeover AutoCAD drawings TZB | |
transfer of AutoCAD drawings TZB into the OBR format | |
digitizing TZB equipment | |
montage AutoCAD TZB drawings with the construction drawing | |
creating graphic objects of TZB equipment | |
interconnection AutoCAD drawings TZB with the system | |
creating code list of TZB equipment (identified from drawing documentation) in the range: code, type of device (catalogue) | |
import pictures and code list of TZB equipment into the system |
OTHER ADDITIONAL WORK ON TZB DRAWINGS
- control (inspection) of TZB location without targeting
- targeting TZB equipment (excluding pipelines) and creation of drawing documentation